Site Assessments &
Remediation Project Examples
Industrial Complex Remediation
Branford, CT
(Atlantic Wire Site)
Client: Branford Atlantic
Realty
Description: Triton provided
site investigation and remedial design and implementation services for
this 6 acre parcel within the coastal boundary of Long Island
Sound. The site previously operated as a manufacturing facility
producing steel and cooper wire.
Triton's Phase II and Phase III investigations
determined that site activities had resulted in both petroleum and
solvent impacts beneath the site building. Triton conducting a
soild vapor survey to determine site compliance with volatilization
criteria, and is implementing a remediation of chlorinated solvent
contaminated soil and groundwater through significant in-situ
chemical oxidation injection program beneath the building.
Initial results indicate significant reduction in solvent concentrates
due to the chemical oxidation process.
Role: Conducted comprehensive
Phase II and Phase III testing to define on-site and off-site impacts,
developed remedial strategy involving use of in-situ chemical oxidation
and soil excavation, calculated site specific cleanup criteria.
|
 |
|