Site Assessments &
Remediation Project Examples
Elementary School System Development
Bridgeport, CT
Client: City of Bridgeport
Description: Triton is
currently completing large scale assessment and remediation projects
for the City of Bridgeport. These sites are in the process of
being redeveloped for three (3) new schools. The properties
acquired by the city include a mixture of industrial, commercial, and
residential sites. Triton has conducted Phase I, II, and III work
including site investigations, risk based assessments, remediation
design, and oversight of remediation activities. Triton worked
with the city to develop pre-acquisition plans to investigate the sites
and develop options for further assessment and remediation in
accordance with the future school design.
The properties investigated have included a former
autobody repair facility, a tool and die shop, machine shop,
warehouses, printing shop, and several other industrial
facilities. Demolition and remediation was required on most of
these properties. Triton conducted site wide geophysical surveys
to identify potential buried waste materials, provided soil sampling to
define contaminated areas, and installed groundwater monitoring wells
to evaluate groundwater quality. Triton worked closely with the
City to develop remedial strategies in accordance with school
design. Triton managed site remediation, which included
underground storage tank removal, remediating petroleum contaminated
soils, and designing engineering controls to address urban fill
deposits. Triton also provided community relations support by
attending city meetings to provide technical expertise and by
maintaining open communications with interested parties.
Role: Detailed site
investigations of each parcel (Phase I, Phase II, and Phase III),
development of remedial action plans under the Voluntary Remediation
Program, and remediation oversight.
|
 |
|